Thursday, January 17, 2013

The sand, the surf, the TRAFFIC! The NC DOT has plans to replace the swing bridge to TI with a new highrise permanent bridge. Get all the info about when getting to the beach becomes a little easier on page 1D of the 1/17 edition of The Duplin Times.

No comments:

Post a Comment